Port Leucate de la Clarianelle

Ensemble résidentiel et un équipement public culturel

Cultural institutionsResidential
Port Leucate
Carta - Reichen et Robert Associates - Port Leucate de la Clarianelle

Regeneration of the site of the former tennis club of Port Leucate de la Clarianelle.
The project is fully in line with the move towards urban development of the Port Leucate marina.
The municipality wishes to locate on this site a public cultural facility, a real-estate operation consisting of quality residential stock, and secondarily, a comfort station for boaters.
The desire of the Port Leucate authorities is to move towards urban development of its marina to meet increasing residential needs, while preserving its identity and a privileged relation with the environment.


Competitions : 2017

PROJECT OWNER
PITCH PROMOTION MONTPELLIER
PROMEO PATRIMOINE

PROJECT SUPERVISION
Reichen et Robert & Associés

AREAS
7,700 m² operational perimeter
Distribution
8,050 m² floor area / 92 housing units
Typology: 12 2-room - 53 3-room - 4 3-room Duplex - 18 4-room - 1 5-room
184 parking spaces

CERTIFICATIONS
RT 2012 minimum / NF Habitat

PROJECTED BUDGET
€2.5 M excluding tax

CREDITS
Perspectives: Platform

Carta - Reichen et Robert Associates - RRA_Port Leucate_17024LPP_PORT MODIF.jpg
Carta - Reichen et Robert Associates - RRA_Port Leucate_17024LPP_PLAN_MASSE.jpg